Rio Mesa Solar Electric Generating Facility

From Wikipedia, the free encyclopedia
(Redirected from Rio Mesa Solar Project)
Jump to navigation Jump to search

Rio Mesa Solar Electric Generating Facility
Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value).
CountryUnited States
Locationnear Blythe, Riverside Co.
CoordinatesLua error in Module:Coordinates at line 489: attempt to index field 'wikibase' (a nil value).
StatusProposed
Construction beganplanned for 2013; cancelled
Commission dateplanned for 2016; cancelled
Construction cost$2 billion
Solar farm
TypeCSP
CSP technologySolar power tower
Site area4,070 acres (16.5 km2)
Power generation
Lua error in Module:Infobox_power_station at line 110: attempt to index field 'wikibase' (a nil value).
Nameplate capacity500 MW

The Rio Mesa Solar Electric Generating Facility was a proposed 500 megawatts (670,000 hp) solar thermal power project in Riverside County, California. The developers for the project were subsidiaries of BrightSource Energy, Inc.[1] The plant was expected to cost about $2 billion.[2]

The plant was to comprise two solar power towers, each with a generating capacity of 250 megawatts (340,000 hp). About 170,000 heliostats would have reflected sunlight to the receivers mounted on top of the 750-foot (230 m) towers.[2] The project was scaled down from 750 megawatts (1,010,000 hp) to 500 MW in May 2012, for which it has a power purchase agreement (PPA) with Southern California Edison (SCE).[3]

In December 2011, the California Energy Commission (CEC) accepted the application for certification for the Rio Mesa SEGF. In October 2012, Rio Mesa received preliminary approval from the CEC; final approval was needed by June 2013 to fulfill its PPA.[4] However, the discovery of a large deposit of Pleistocene fossils underlying part of the project's area delayed approval or construction.[5] In January 2013, BrightSource suspended the Rio Mesa project;[6] the project was formally cancelled in July 2013.[7]

References

[edit | edit source]
  1. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  2. ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  3. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  4. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).[dead link]
  5. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  6. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  7. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
[edit | edit source]
Lua error in mw.title.lua at line 392: bad argument #2 to 'title.new' (unrecognized namespace name 'Portal').
  • Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  • Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).