Porsche Design Tower (Stuttgart)
| Porsche Design Tower | |
|---|---|
| File:Porsche Design Tower (Stuttgart) 1X7A0236.jpg | |
| Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value). | |
| General information | |
| Status | Completed |
| Type | Mixed-use: Office / Hotel |
| Location | Stuttgart, Germany, 6 Siemensstraße, Stuttgart, Germany |
| Coordinates | Lua error in Module:Coordinates at line 489: attempt to index field 'wikibase' (a nil value). |
| Construction started | 2020 |
| Completed | 2023 |
| Owner | Porsche Design (branded) |
| Height | |
| Roof | 90 m (300 ft)[1] |
| Technical details | |
| Structural system | Concrete |
| Floor count | 25 |
| Floor area | 20,000 m2 (215,000 sq ft) |
| Design and construction | |
| Architect | Bülow Aktiengesellschaft |
| Developer | Radisson Hotel Group |
| Structural engineer | Doka GmbH (formwork) |
| Website | |
| Porsche Design Tower Stuttgart | |
The Porsche Design Tower is a mixed-use high-rise building in the Pragsattel district of Stuttgart, Germany. Built between 2020 and 2023, the tower stands at 90 m (300 ft) tall with 25 floors and is the current tallest habitable building in Stuttgart.[2]
History
[edit | edit source]Architecture
[edit | edit source]The Porsche Design Tower is 87 meters high and has 25 floors above ground, making it the tallest skyscraper in Stuttgart.[3] It opened in mid-2023 and is branded by Porsche Design. The Porsche Design Tower has 134 underground parking spaces and a floor area of around 20,000 m2 (215,000 sq ft).[4]
Along with a building in Sunny Isles Beach, it is the second building to bear the name Porsche Design Tower. A third construction project in Frankfurt was canceled in the planning phase.[5]
Construction was originally scheduled to begin in July 2019 and be completed by the end of 2022, but the approval process was suspended in November 2019.[6]
The construction site was set up in March 2020.[7] Before that, the site had to be cleared of contaminated soil.[8] In August 2020, a 119 m high construction crane was erected.[9] The shell was completed in February 2022,[10] the opening was in mid-2023.[11]
In addition to a publicly accessible restaurant on the 10th floor, there is office space up to the 8th floor, the main tenant is Porsche Consulting GmbH. In addition to two technical floors, the upper floors of the tower house a hotel with 168 rooms and conference rooms, which the Radisson Hotel Group has operated under the Radisson Blu brand since November 2023.[12] Porsche 's Stuttgart branch also moved to the property from Stuttgart-Zuffenhausen in September 2022.[13]
Gallery
[edit | edit source]-
Construction progress in January 2021
-
In May 2021
-
In December 2021
-
In April 2022
-
and in September 2022
See also
[edit | edit source]References
[edit | edit source]- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).Lua error in Module:WikidataCheck at line 29: attempt to index field 'wikibase' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Porsche Design Tower und neues Porsche Zentrum am Pragsattel
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Porsche-Turm: Genehmigungsverfahren liegt auf Eis in: Stuttgarter Zeitung, vom 6. November 2019
- ^ Porsche beginnt mit Hochhausbau am Pragsattel. stuttgarter-zeitung.de vom 2. März 2020
- ^ Stadt muss für Porsche-Gelände bezahlen. stuttgarter-zeitung.de vom 21. Januar 2020
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
External links
[edit | edit source]Lua error in Module:Authority_control at line 153: attempt to index field 'wikibase' (a nil value). Lua error in mw.title.lua at line 392: bad argument #2 to 'title.new' (unrecognized namespace name 'Portal').
- Skyscrapers in Germany
- Buildings and structures in Stuttgart
- Skyscraper office buildings in Germany
- Buildings and structures completed in 2023
- Office buildings completed in 2023
- Skyscraper hotels
- Hotel buildings completed in 2023
- Hotels established in 2023
- 2023 establishments in Germany
- 21st-century architecture in Germany
- Modernist architecture in Germany
- Radisson Hotels
- Porsche