National Freeway 6

From Wikipedia, the free encyclopedia
(Redirected from National freeway 6)
Jump to navigation Jump to search
National freeway 6 shield}}
National freeway 6
Shuishalian Freeway (水沙連高速公路)
Lua error in Module:Mapframe at line 703: attempt to index field 'wikibase' (a nil value).
Route information
Maintained by Taiwan Area National Freeway Bureau
Length37.6 km (23.4 mi)
Existed21 March 2009–present
Major junctions
West end Nat 3 in Wufeng District
East end Prov 14 in Puli
Location
CountryTaiwan
Highway system
Nat 5 Nat 7
File:West end of the Taiwan No6 National Highway at Wufeng JCT.JPG
Freeway 6
File:Guosing Interchange.jpg
Guoxing Interchange

National freeway 6, also known as Shuishalian Freeway or Central East-West Freeway, is a freeway between Wufeng, Taichung and Puli, Nantou, and all of the main line was already open to traffic on 21 March 2009. The freeway runs parallel with provincial highway 14 for most of its length.

Length

[edit | edit source]

The length is about 37.6 km between Wufeng, Taichung and Puli, Nantou.

Exit List

[edit | edit source]
CountyLocationkm[1]miExitNameDestinationsNotes
Taichung CityWufeng0.00.00Wufeng System Nat 3
3.01.93JiuzhengFile:TW PHW3.svg Prov 3 – Wufeng, CaotunWestbound exit and eastbound entrance
NantouCaotun5.03.15East Caotun Prov 14 – Caotun
Guoxing17.010.617Guoxing Prov 14 – Guoxing
25.015.525Beishan Prov 14 – Guoxing, PuliEastbound exit and westbound entrance
Puli29.018.029Ailan Prov 14 – Yuchi, Puli
34.021.134PuliFile:TW PHW21.svg Prov 21 – Guoxing, PuliEastbound exit and westbound entrance
37.023.037 Prov 14 – Puli, Wushe
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Background

[edit | edit source]

Its construction began on 25 March 2004. On 27 January 2008, the main line between Ailan IC and Puli terminal was open to traffic. Then, the main line between Wufeng JCT and East Caotun IC, and the East Caotun connection way were open to traffic on 27 December 2008. The other part of main line between east Caotun IC and Ailan IC was already open to traffic on 21 March 2009. Afterwards, Guoxing IC was open to traffic on 22 October 2009. Then, Jiuzheng IC was open to traffic on 31 January 2011. Beishan IC was completed on 21 November 2013.

There is a plan to extend the route further east to Hualien City. However, it is technically difficult due to the mountains between Puli, Nantou and Hualien City.