Line 3 (Ningbo Rail Transit)

From Wikipedia, the free encyclopedia
(Redirected from Line 3, Ningbo Rail Transit)
Jump to navigation Jump to search
Line 3
Error creating thumbnail:
Line 3 train at Jinhai Road station
Overview
StatusOperational
OwnerNingbo
LocaleNingbo, Zhejiang, China
Termini
Stations24
Service
TypeRapid transit
SystemNingbo Rail Transit
Operator(s)Ningbo Rail Transit Co., Ltd.
History
Opened30 June 2019; 6 years ago (2019-06-30)[1]
Technical
Line length37.45 km (23.27 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead catenary with 1,500 V DC
Route map
File:Line 3, Ningbo Rail Transit.svg

Line 3 of Ningbo Rail Transit (Chinese: 宁波轨道交通3号线) is a rapid transit line in Ningbo. It starts from south Fenghua District and ends in Datong Bridge Station in Jiangbei District. In the future extension plan, the line will further extend into Luotuo Area in Zhenhai District.[2] The construction of the first section, from south Yinzhou to Datong Bridge, started on 23 December 2014.[3]

Route

[edit | edit source]

Line 3 starts from Jinhai Road station as an elevated line. It goes north behind the Airport Road until Chaoyang station and turns into east direction on Yanhu Road to Shishan station. Then it turns north again and underground into Gaotang Bridge Station. Then it turns into east–west direction on Yinzhou Avenue and makes a further turn into Ningnan South Road and goes in north–south direction again until it reaches Songjiang Middle Road. Then it runs to northeast to Qiubi and then crosses the Ningbo–Taizhou–Wenzhou railway from which it goes in north–south direction and extends along Zhongxing Road until it crosses Yongjiang River and reaches its destination, Datong Bridge Station.[4]

Phase 2 of line 3 will have 5 more stations north of Datong Bridge, but due to restrictions of an old airport, part of the phase 2 between Datong Bridge and Yongmao Road is stalled for construction.[5] The rest 3 stations of phase 2 has started construction since 2 December 2019,[6] and will temporary run as a part of line 5. Test run of phase 2 of line 3 started on 1 February 2024.[7]

Opening timeline

[edit | edit source]
Segment Commencement Length Station(s) Name
Datong Bridge — Gaotang Bridge 30 June 2019[1] 16.73 km (10.40 mi)[1] 15 Line 3 (Phase 1)
Gaotang Bridge — Minghui Road 28 September 2019 5.61 km (3.49 mi)[citation needed] 3 Yinfeng Section
Minghui Road — Jinhai Road 27 September 2020[8] 15.92 km (9.89 mi) 6
Luotuo Bridge — Yongmao Road 28 June 2024[9] 3 Phase 2, now temporarily run as a part of Line 5

Stations

[edit | edit source]

Phase 1

[edit | edit source]
Service routes Station name Connections Distance
km
Location
Local Rapid English Chinese
Datong Bridge 大通桥  2  0.00 0.00 Jiangbei
Zhongxing Bridge South 中兴大桥南 1.72 1.72 Yinzhou
Minglou 明楼  6  1.26 2.98
Sports Center 体育馆  7  0.98 3.96
Sakura Park 樱花公园  1  0.96 4.92
Children's Park 儿童公园  4  1.19 6.11
Qiubi 仇毕 0.98 7.09
Qianhu North Road 钱湖北路 1.43 8.52
Jinyu Road 锦寓路 0.97 9.49
Siming Middle Road 四明中路 1.17 10.66
Yinzhou Government 鄞州区政府  5  0.74 11.40
Southern Business District 南部商务区  8  1.33 12.73
Yinzhou Coach Terminal 鄞州客运总站 1.25 13.98
| Gouzhang Road 句章路 1.34 15.32
| Gaotang Bridge 高塘桥 0.82 16.14
Jiangshan 姜山 1.73 17.87
| Shishan 狮山 1.35 19.22
| Minghui Road 明辉路 1.31 20.53
| Chaoyang 朝阳 1.88 22.41
Fangqiao 方桥 4.46 26.87 Fenghua
| Jinlin 琎琳 2.58 29.45
| Nandu 南渡 1.61 31.06
Dacheng East Road 大成东路 4.04 35.10
Jinhai Road 金海路 2.35 37.45

Phase 2

[edit | edit source]

See Line 5 (Ningbo Rail Transit)#Stations.

References

[edit | edit source]
  1. ^ a b c Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  2. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  3. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  4. ^ China Railway Siyuan Survey and Design Group, Environment impact report of Line 3, Ningbo Rail Transit, Wuhan, February, 2014
  5. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  6. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  7. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  8. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  9. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).