Granite Canal Hydroelectric Generating Station
This article relies largely or entirely on a single source. (October 2024) |
The Granite Canal Hydroelectric Generating Station[1] is a component of the Newfoundland and Labrador Hydro Corporation's Bay d’Espoir Hydro Electric Development system. The generating station has a rated capacity of 40 MW with an annual average energy production of 224 gigawatt hours (GWh). The generating unit at Granite Canal utilizes approximately 37 metres of head with a rated plant flow of 122.4 cubic metres per second. The unit is equipped with a Kaplan turbine and was first synchronized on May 26, 2003.
A fish habitat compensation system was included in this development to ensure any aquatic habitat loss was avoided, reduced or replaced. A Fish Habitat Compensation Agreement was signed with Fisheries and Oceans Canada to ensure proper construction, utilization and long term viability of the facility.
Lua error in Module:Coordinates at line 489: attempt to index field 'wikibase' (a nil value).
References
[edit | edit source]- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).