Coordinates: 53°36′23″N 0°08′38″W / 53.6063°N 0.1439°W / 53.6063; -0.1439

Newlincs EfW facility

From Wikipedia, the free encyclopedia
(Redirected from Cyclerval)
Jump to navigation Jump to search

Newlincs EfW facility
File:Grimsby incinerator.jpg
NewLincs EfW facility in 2008
Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value).
Official nameNewLincs EfW facility
CountryEngland
LocationLincolnshire, Yorkshire and the Humber
CoordinatesLua error in Module:Coordinates at line 489: attempt to index field 'wikibase' (a nil value).
Commission date2004
OperatorNewLincs Developments Ltd
Thermal power station
Primary fuelWaste
Power generation
Lua error in Module:Infobox_power_station at line 110: attempt to index field 'wikibase' (a nil value).

grid reference TA229138

The Newlincs EfW facility is an energy from waste facility which is located in Grimsby, North East Lincolnshire, England. The plant is operated by Cyclerval UK & TIRU Group under a PFI contract. The engineering of the facility is unusual as it consists of an oscillating kiln handling 56,000 tonnes of waste per year/7 tonnes per hour of waste. The facility is capable of generating 3.2 MW electricity.[1]

See also

[edit | edit source]

References

[edit | edit source]
  1. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value)., www.newlincs.com, Retrieved 22 February 2007
[edit | edit source]