Ambala–Chandigarh Expressway

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Ambala Chandigarh Expressway
Lua error in Module:Infobox_road/map at line 19: attempt to index field 'wikibase' (a nil value).
Route information
Length35 km (22 mi)
Major junctions
West endAmbala
East endChandigarh
Location
CountryIndia
StatesHaryana, Punjab
Highway system

Ambala Chandigarh Expressway is four-lane 35 km long,[1] high-traffic density corridor of Ambala-Chandigarh section (km 5.735 to km 39.960 on NH-152 and 0 km to 0.871 km on NH 5) on BOT basis, was completed in 30 months at a cost of 2.98 billion (US$35 million)[2] The expressway has been operational since December 2009 and was constructed by the GMR Group with assistance from the World Bank.

38 km south of Ambala at existing NH152 (Ambala-Pehowa-Narwana-Fatehabad-Sirsa), it connects with the controlled access tolled Ambala–Narnaul Expressway (Trans-Haryana Expressway).

See also

[edit | edit source]

References

[edit | edit source]
  1. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  2. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).